| Model | UK Boiler Upgrade Scheme Product Eligibility List |
|---|---|
| Eco-Airmax Model GEE 12.5PH1 Heat pump | Listed since at least 12 Oct 2026 Certification period ends 14 Oct 2027 |
| Eco-Airmax Model GEE 6PH1 Heat pump | Listed since at least 12 Oct 2026 Certification period ends 14 Oct 2027 |
| GEE11PH1 Heat pump | Listed since at least 12 Oct 2026 |
| GEE15PH1 Heat pump | Listed since at least 12 Oct 2026 |
| GEE18PH1 Heat pump | Listed since at least 12 Oct 2026 |
| GEE9PH1 Heat pump | Listed since at least 12 Oct 2026 |
"Since at least" means the line was already on the list when our record of it began. Names can be printed differently on each list; a model missing from a column may be listed under another spelling. Report a problem
Changes to Green Energy Engineering Ltd lines
Our record of Green Energy Engineering Ltd lines began on 12 Oct 2026. Nothing has changed since. The lists are checked every morning, and any change appears here the same day.
Watch Green Energy Engineering Ltd
One email on the morning a Green Energy Engineering Ltd line is added, removed or changed on any list we check. Free: every change for 14 days, then a Monday summary.
Every morning, as long as you subscribe: alerts at £490 a year or £49 a month follow Green Energy Engineering Ltd on every list. The manufacturer plan, £149 a month, adds this sheet kept for your team and an API key. Compare plans. 30-day refund.